GEOSANTA, M M; INDRAYANTI, A A P; BUDIADI, I M.
ANALISIS PERBANDINGAN PERCEPATAN WAKTU PENYELESAIAN PROYEK DENGAN MENGGUNAKAN METODE FAST TRACK DAN WHAT IF (Studi Kasus: Pembangunan Gedung D4 Politeknik Negeri Bali).
Proceedings, [S.l.], v. 1, n. 1, p. 155-164, nov. 2020.
Available at: <https://ojs.pnb.ac.id/index.php/Proceedings/article/view/2225>. Date accessed: 29 mar. 2024.