%A Pratama, I Putu Bayu Andhika %A Sudiarta, I Komang %A Ardika, I Wayan Dana %D 2020 %T ANALISIS PRODUKTIVITAS TENAGA KERJA DALAM MEMITIGASI KETERLAMBATAN PROYEK GEDUNG RUMAH SAKIT BHAYANGKARA DENPASAR %B 2020 %9 %! ANALISIS PRODUKTIVITAS TENAGA KERJA DALAM MEMITIGASI KETERLAMBATAN PROYEK GEDUNG RUMAH SAKIT BHAYANGKARA DENPASAR %K %X In the construction project implementation, there is a risk of delays. If the implementation of a construction project in the field does not comply with the planned schedule, this will have an impact on the timeliness of project completion. By controlling and increasing labor productivity, it can optimize the implementation time so as not to experience delays. The purpose of this study is to determine the productivity of the workforce and determine the appropriate implementation method in structural work to mitigate delays. The analysis carried out is descriptive quantitative analysis. Data collection is carried out by direct observation in the field and data provided by the Company in the form of a time schedule. Based on the research conducted, there are 16 types of work that are at risk of experiencing delays if mitigation is not carried out. Therefore, the methods that can be used to mitigate delays in this study are the addition of working hours (overtime) and additional workforce based on the calculation scenario between volume shortages in 8 hours of work and productivity of hourly workers %U https://ojs.pnb.ac.id/index.php/Proceedings/article/view?path= %J Proceedings %0 Journal Article %& 199 %P 9 %V 1 %N 1 %8 2020-11-29 %7 2020-11-30