TY - JOUR AU - Wiryawan, I Nyoman Oka AU - Sudiarsa, Made AU - Yasada, Gede PY - 2020 TI - PEMILIHAN METODE PELAKSANAAN PEKERJAAN STRUKTUR DENGAN MENGGUNAKAN METODE ZERO-ONE PADA PROYEK PEMBANGUNAN GEDUNG SMAN 2 ABIANSEMAL JF - Proceedings; Vol 1 No 1 (2020): Prosiding Seminar Nasional Ketekniksipilan Bidang Vokasional VIII KW - N2 - A construction project plan that had been well-planned often encountered obstacles in its implementation, it occurred due to the poor management, inappropriate resources, the time schedule which was not in accordance with the plan, or the inaccurate choice of implementation method. Knowing that there were some indicators of project achievement, therefore it could be better to pick some alternative implementation methods which were considered the best. In the construction project of SMAN 2 Abiansemal building which was located in Sedang Village, Abiansemal, Badung, Bali, it was necessary to choose an alternative implementation method. This research used a descriptive quantitative research method, which used measured data, which were primary data; labour productivity & tools, and secondary data; shop drawing, BOQ (Bill of Quantity), and time schedule. The result showed that the best alternative was by using scaffolding as the scaffold, 9 mm plywood as the formwork, casting using CP and the addition of working hours and labours which was assessed from the factors of cost saving, time, quality, availability of materials and environmental impact. From the analysis result of the alternative using zero-one method, the best method used was the method that included in alternative II. The cost saving between the existing and the best alternative was IDR 23,488,183 or 2.21% of the existing and the implementation time, which was faster for 4 (four) days than the existing one. UR - https://ojs.pnb.ac.id/index.php/Proceedings/article/view?path=