TAPA YASA, I Made et al.
THE COST OBTAINED BY APPLYING PRECEDENCE DIAGRAM METHOD TOWARD THE TIME OPTIMIZATION ON BUILDING DEVELOPMENT PROJECTS.
Logic : Jurnal Rancang Bangun dan Teknologi, [S.l.], v. 18, n. 2, p. 64-71, july 2018.
ISSN 2580-5649.
Available at: <https://ojs.pnb.ac.id/index.php/LOGIC/article/view/973>. Date accessed: 19 apr. 2024.
doi: http://dx.doi.org/10.31940/logic.v18i2.973.